Development

Sr. No Category Work Details Probable date of completion Area/Beneficiaries
51 WATER SUPPLY, DELIVERY, TESTING AND COMMISSIONING OF 75 KW MIXED FLOW PUMP SETS FOR DEAD STORAGE PUMPING FROM KRISHNA BARAGE TO UNDAVALLI SUMP AT UNDAVALLI IN AE-WW SECTION 21/03/2016 4900000
52 DRAINS PROVIDING CC DRAIN FROM SARASWATHI THEATRE TO GGH COMPOUND WALL AT SAMBASIVARAO PET 4TH LINE IN DIV. NO.11 12/02/2016 300000
53 B.T. ROAD RE-STRENGTHENING OF DAMAGED B.T. ROAD AT ADAVI TAKKELLAPADU MAIN ROAD FROM CHAINAGE 270.00 TO 540.00 IN AE-2 SECTION 22/12/2015 480000
54 ROADS RE-STRENGTHENING OF DAMAGED AT ADAVI TAKKELLAPADU MAIN ROAD FROM CHAINAGE 5.40 MM TO 810.00 IN AE-2 SECTION 22/12/2015 470000
55 B.T. ROAD RE-STRENGTHENING OF DAMAGED B.T. ROAD AT ADAVI TAKKELLAPADU MAIN ROAD FROM CHAINAGE 0.00 TO 270.00 IN AE-2 SECTION 22/12/2015 490000
56 B.T. ROAD RE-STRENGTHENING OF DAMAGED B.T. ROAD AT ADAVI TAKKELLAPADU MAIN ROAD FROM CHAINAGE 810.00 TO 1080.00 IN AE-2 SECTION 22/12/2015 487000
57 B.T. ROAD RE-STRENGTHENING OF DAMAGED B.T. ROAD AT ADAVI TAKKELLAPADU MAIN ROAD FROM CHAINAGE 1080.00 TO 1350.00 IN AE-2 SECTION 22/12/2015 495000
58 LEAKS ARRESTING REPLACEMENT OF DAMAGED AIR VALVES IN 900 MM DIA RCC PUMPING LINE FROM MANGALAGIRI TO TAKKELLAPADU HEAD WATER WORKS 20/01/2016 495000
59 LEAKS ARRESTING RESTORATION OF 900 MM DIA RCC WATER PUMPING LINE LEAK FROM MANGALAGIRI TO TAKKELLAPADU HEAD WATER WORKS 20/01/2016 499000
60 OFFICE PURPOSE SUPPLY AND DELIVERY OF XEROX MACHINE AT GMC MAIN OFFICE ENGINEERING SECTION 22/12/2015 170000
61 CHLORINE GAS SUPPLY AND DELIVERY OF LIQUID CHLORINE FOR THE MAINTENANCE OF WATER SUPPLY AT A.T. AGRAHARAM RESERVOIR IN GMC 11/02/2016 95000
62 PARKS PROVIDING RED EARTH AND LAWN AT LUMBINI PARK IN COLLECTOR OFFICE PREMISES IN DIV. NO.23 03/06/2016 500000
63 B.T. ROAD PROVIDING HOT MIX B.T. ROAD TO LITTLE FLOWER SCHOOL OPP. ROAD SMALL CUT ROADS IN VIDYA NAGAR IN DIV. NO.34 04/03/2016 496000
64 B.T. ROAD PROVIDING HOT MIX B.T. ROAD AT 2ND LINE OF SYAMALA NAGAR FROM D. NO.2-14-447 UPTO SOUTH BALA KUTEER ROAD IN DIV. NO.32 04/03/2016 330000
65 B.T. ROAD PROVIDING HOT MIX B.T. ROAD FROM UTCHAVA GARDENS ROAD TO EAST END IN VIDYA NAGAR IN DIV. NO.34 04/03/2016 390000
66 HIRING OF WATER TANKERS ENGAGING OF 4KL WATER TANKERS (5 NOS.) TO UNSERVED AREAS AT NALLACHERUVU RESERVOIR IN AE-4 SECTION (01-11-2015 TO 31-12-2015) 18/03/2016 400000
67 VEHICLES SUPPLY & DELIVERY OF FISH KNETTED AND ROPE FOR DUMPERS, TRACTORS, AUTO'S & HEAVY LOADERS IN AE-VEHICLES 16/02/2016 98000
68 REPAIRS FOR EXISTING BUILDINGS PROVIDING CC DRAINS AND REPAIRS & IMPROVEMENTS TO OPEN AUDITORIUM AND WATCHMAN ROOM IN MAHILA BALALA GRANDHALAYAM AT KUNDULA ROAD IN DIV. NO.35 17/04/2016 950000
69 SLUICE VALVES PROVIDING M.S. SHEET GRILLS TO RAW WATER SLUICE VALVE GUNTUR CANAL IN TAKKELLAPADU RAW WATER PUMP HOUSE 24/02/2016 150000
70 WATER Supply and delivery of Liquid Chlorine and Bleaching Powder to Etukuru Reservoir in Div.No.60 11/02/2016 85000
71 REPAIRS TO PUMPSETS ETC PROVIDING 30 HP & 10 HP MOTOR REWINDING AND REPAIRS AT A.T. AGRAHARAM RESERVOIR AREA 03/12/2015 49000
72 CONSTRUCTION OF COMPOUND WALLS CONSTRUCTION OF BALANCE PORTION COMPOUND WALL AT COLLECTORS CAMP OFFICE SOUTH SIDE WALL IN DIV. NO.24 (BALANCE WORK) 01/01/2016 440000

Pages